Septic Install OKC
Aerobic System Maintenance and Oklahoma DEQ Rules
What owners are responsible for.
Aerobic systems are common in central Oklahoma, where clay soils limit conventional lateral lines. Under Oklahoma DEQ rule OAC 252:641-10-3:
- The installer must maintain a new aerobic system for two years at no extra cost, including repairs and testing every six months.
- After two years, the owner is solely responsible for maintaining it or hiring a maintenance provider.
- Spray systems need chlorine disinfection; keep tablets or liquid chlorine stocked.
Owner checklist
- Don't ignore the alarm light — it usually means a failed aerator or high water.
- Keep spray heads clear and away from where people gather.
- Don't switch off the air compressor to save power.
If your installer isn't providing required maintenance, DEQ asks owners to call 1-800-522-0206.
Sources
General information only. Not professional, legal or medical advice.